As experienced kitchen and bath renovation contractors, we are often hired to build beautiful new kitchens featuring islands that transform the functionality of a kitchen. An important consideration is the importance of proper plumbing venting, for these island sinks and fixtures. The reasoning on why proper venting is required and how we professionally address these unique installations is very interesting.

In today’s discussion and article here, we’ll cover the science of hydraulics related to plumbing venting, code requirements, and challenges specific to kitchen islands. We’ll also discuss the process for installing effective vents using preferred techniques like air admittance valves. Proper venting is actually important for protecting building occupant health, preventing problematic drain line issues, and ensuring satisfaction with the newly renovated kitchens.

The Reason Plumbing Vents are a Requirement 

Vents are a requirement in almost any drain/waste/vent system.  Vents serve two primary purposes: allowing sewer gases to safely vent outdoors rather than enter living spaces, and maintaining balanced air pressure to prevent self-siphoning of trap seals and allow complete drainage from fixtures.

why vents are required in kitchen

Sewer gasses like methane and hydrogen sulfide can be harmful, even toxic, if allowed to flow back inside of building interiors unmitigated, through drain lines. Proper venting provides an escape pathway outdoors for these gasses, removing health hazards and unpleasant odors. Vents also allow air to re-enter drain lines behind flowing wastewater. This prevents the creation of vacuums and negative pressure that could siphon water out of p-traps. P-trap seals prevent gases from escaping living spaces. Without balanced venting, traps could lose their seal and allow dangerous gas intrusion.

Venting Rules and Regulations

Building codes and AHJ  regulations govern most vent installations. The International Plumbing Code (IPC) was widely used before the more recent ICC codes adopted by Washington, DC.  The basis for most local codes in the US. Section 909 covers venting specifications like minimum diameters and connection points in relation to drainage piping.

The key requirements are that fixtures must be vented, vent piping must be no less than 1.5″ diameter, and vents must connect above the trap arm and as close as possible to the drainage tee or connection point. Vents must terminate either to open air or into a main vent stack that terminates outside. Venting methods like air admittance valves are also permitted provided they conform to other referenced standards.  These rules apply to many but not all installations.

drain at a kitchen island

It’s necessary to check local regulations as well, especially if outside of Washington DC, or in industrial settings, since municipalities can allow the disregard of code systems or adopt additional restrictions or allowances regarding venting methods and materials. 

Compliance with current codes and or standards is critical from a quality control and quality assurance perspective in almost all cases.  

Addressing the Unique Challenges of Kitchen Islands

Islands pose a unique challenge for proper venting because there is no wall cavity to run vertical vent stacks through. But venting is still required by code, so remote island fixtures must be vented using alternative methods.

The key obstacles to be overcome are 1) physically connecting vents when there is no direct vertical pathway, and 2) running vent piping horizontally through cabinets and still meeting connection point requirements. We also have to maintain accessibility for inspection and service in the future.

Venting Solutions for Islands

With no straight vertical path, the main venting solutions we utilize for islands are:

  • Tying vents into existing vent stacks in adjacent wall cavities, if distance and physical spacing configuration which is extremely rare for modern islands
  • Using air admittance valves (AAVs)

Another island venting method we may utilize if circumstances allow is a loop vent. This involves tying the island vent pipe into a horizontal run of the main building drain line and using that to extend the vent connection to an existing vent stack. For a loop vent to work, the connection point must be downstream of the last fixture draining into that waste branch.

loop vents

Loop vents are an option when there is adequate access to the main drain line running under or near the island location. We would cut in a sanitary tee to tie the vertical vent pipe from the island into the horizontal drain line. This allows air exchange while venting any gasses downstream. The requirements are that the connection must be after the final discharge point and at least 4″ lower than the island fixture flood rim height.

Loop vents may be an alternative to AAVs in some cases but require more extensive plumbing modifications. The main drain must have capacity and accessibility. But when feasible, loop vents avoid the need for mechanical valves and simplify the vent piping layout. We assess drainage plans carefully before proposing their use for kitchen islands or other remote fixtures needing proper venting.

proper kitchen venting

Running new vent pipes is invasive and expensive, usually requiring extensive demolition. Tying into existing vents is only possible if stacks are close enough. For most island venting needs, we recommend using AAVs. These compact, specialized valves allow air exchange while preventing venting of sewer gases. They satisfy code requirements and are easy to install and service.

recommended kitchen vents

Installation Process Notes

Now let’s walk through the full process our teams follow to install proper vents for new kitchen islands:

  1. Consult codes to verify AAVs are permitted. Double check with the local building department if unsure.
  2. Determine the optimal location under the sink or in cabinets for access. Confirm the drainage connection point.
  3. Cut an access hole and map connections from the drain line branch arm to the valve location.
  4. Shut off water supply and drain the line. Cut in a tee fitting at the connection point to tie in the valve.
  5. Add short vertical pipe section from the tee to the access hole, cut to appropriate length.
  6. Secure the AAV to the vertical pipe with outlet pointed up according to specifications.
  7. Re-assemble drain connections, turn water on, and test for leaks. Verify drainage performance.
  8. Add finishing escutcheons and seal up access hole neatly.
  9. Explain the venting system to homeowners and point out valve location for future reference.

As dedicated and local DC metropolitan kitchen and bath builders and installers, we pride ourselves on turning your visions into reality. Your kitchen can reflect your unique style, equipped with state-of-the-art appliances and designed with personalized aesthetics. It can be a process from creative designs to the realization of your dream space. Specializing in kitchen and bath construction, we bring expertise and skills to every project. If you’re contemplating a renovation, upgrade, or modernization in the local market, we’re happy to be your team. Consult with us, and we can start together on a path to redefine and elevate your home living experience.

Here at our website you will find a simple and convenient web form that you can fill to contact us quickly.

On Key

Related Posts

Bathroom Floor Drain - Part II

Bathroom Floor Drain – Part II

Advanced Tips for Bathroom Floor Drain Maintenance – Part II In past week’s blog article, we started looking at the floor drain shown in the

Bathroom Floor Drain - Part I

Bathroom Floor Drain – Part I

Bathroom Floor Drain: Installation and Maintenance Tips – Part I Over the past couple weeks, we looked at a couple different kitchen and bathroom type